Not logged in
 Order Hotline 01752 705522
Free shipping on all orders over £250 & selected lines

Nuie White 1500mm Left Hand Square Shower Bath WBS1585L

Nuie White 1500mm Left Hand Square Shower Bath WBS1585L #1
Nuie White 1500mm Left Hand Square Shower Bath WBS1585L #2
Nuie White 1500mm Left Hand Square Shower Bath WBS1585L #3

Save 56% off retail price!

White finish. 850 x 390 x 390mm (WxHxD). 1500mm left hand square shower bath from the range of square shower baths from Nuie. Supplied with a 5 year guarantee.
  Ref WBS1585LHSWBS1585L
  Delivery: 3 to 5 days  Free Delivery
  Manufacturer Nuie Bathrooms
  SKU: WBS1585L
  Manufacturer Guarantee: 5 years
  Availability: In Stock
Price: £267.68 inc. VAT
RRP: £609.00
£341.32 discount
Quantity
-
+
  •    Info
  •    Reviews
nuie bathrooms banner

Nuie 1500mm Left Hand Square Shower Bath White - WBS1585L

Nuie WBS1585L Features

  • Suitable for use with a bath screen to create a shower enclosure, a perfect space saving option
  • Sanitary grade acrylic
  • Un-drilled
  • Supplied with leg set
  • Bath panels sold separately

Nuie WBS1585L Specifications

  • White finish
  • Constructed from acrylic
  • Weight: 24.5 Kg
  • Height: 390mm
  • Width: 850mm
  • Depth: 390mm
  • Length: 1500mm
  • Tap holes: 0
  • Waste included: no
  • Displaced capacity: 130L
  • Includes bath panel: no
  • Includes legs: yes
Product Reviews
No Reviews For This Product.
Sale - Extra 5 percent off orders over 500GBP with code MAD5 Sale - Extra 5 percent off orders over 500GBP with code MAD5

Why HomeSupply?

  • Genuine brand names, not cheap imitations
  • Simple checkout -
    no account needed!
  • Over 250,000 happy customers
  • 1,400,000 products delivered
  • Top level shopping security
  • Run by REAL people who are always ready to help
  • The cheapest online prices backed by our Price Promise
  • One simple & competitive delivery fee - no hidden costs!
  • 1000's of products now with FREE DELIVERY
  • UK company, based in Plymouth. Established 2005
Price Promise

We offer fantastic prices across a huge range of products, however, if you find this Nuie Bathrooms item cheaper (inc. delivery) on a competitor's website, let us know and we'll do our best to beat it!

Your Account

 Login Status
Not logged in

Newsletter